Cleaning starts with the plants, before removing the old tarpaulin and cleaning the support.

Clear and conserve plants

The plants are removed with their moths. To keep them during the work, place only the moth in a wet plastic bag and make sure that it remains always moist. Install the plants in shade in the garden, ideally on the north side.

Displacement of plants from the pond — view 1
Displacement of plants from the pond · View 1 · Click to enlarge.

Remove the old tarpaulin

After draining the pond well, it is possible to remove the tarpaulin. At this site, the 0.5 mm thick membrane is light, which facilitates its removal.

Removal of the old PVC sheet — view 1
Removal of the old PVC sheet · View 1 · Click to enlarge.
Removal of the old PVC sheet — view 2
Removal of the old PVC sheet · View 2 · Click to enlarge.
Removal of the old PVC sheet — view 3
Removal of the old PVC sheet · View 3 · Click to enlarge.

Clean the pond and dispose of waste

Once the sheet is removed, the pond is completely cleaned with a hard brush and the waste is disposed of.

Cleaning the pond after removing the tarpaulin — view 1
Cleaning the pond after removing the sheet · View 1 · Click to enlarge.
Cleaning the pond after removing the tarpaulin — view 2
Cleaning the pond after removing the sheet · View 2 · Click to enlarge.
Cleaning the pond after removing the tarpaulin — view 3
Cleaning the pond after removing the tarpaulin · View 3 · Click to enlarge.

A well-preserved stable support

The pond had been constructed with a good layer of stabilization. This support facilitates rehabilitation operations.

Stabilized support after cleaning — view 1
Support stabilized after cleaning · View 1 · Click to enlarge.

The 13 stages of rehabilitation