The pool of Serge — EPDM sheet and fill
Construction with ECOLAT and ECOPIC · Part 4
The felt is in place. This fourth part follows the laying of the EPDM sheet and the filling of the pond, whose volume is estimated at 9 to 10 m³. Click on the pictures to enlarge them.
1. The felt is ready
The protective felt is laid. The construction site is ready for installation of the membrane.
2. Rolling the EPDM sheet
The implementation of the EPDM Firestone tarpaulin begins with its derailment.
3. Unfold the membrane
The membrane is then unfolded to cover the pond.
4. Position and adjust the tarp
The tarpaulin is positioned and adjusted to limit folds.
5. Start filling
Then comes the water supply, a particularly expected step of the construction site.
6. Complete an estimated volume of 9 to 10 m³
The volume of the pond is estimated at 9 to 10 m³. With a watering pipe of 1/2 inch, filling takes time.
7. Observe water intake
Yvon joins the site during the watering. The report sends him a wink as he discovers his reactions.
8. Accelerate filling
An immersable pump is put in place to complete the filling from the rainwater tank.
9. The pond is taking shape
The water pond is taking on its look. There are still work to complete the development.