The connections of the multi-drum filter
The Patpre2000 multi-drum · Part 3
This third part presents the assembly of the purges, the passages between the vats and the distribution of water in the cans.
Parish passageways and connections between vats
The first step is to mount the wall-passes of the back-washing purges. Since the surface of the cans is not very smooth, the author uses a little TEC7 on the joint before mounting to avoid leaks. It indicates that he has slightly sanded and degreased the plastic to promote the adhesion of the mastic.
The passage from one tank to another is mechanically held by a threaded stainless steel rod M6. Nuts and washers are placed at each wall crossing, i.e. ten nuts per connection between tanks. The two T-connectors are not glued in order to allow possible dismantling.
Water level and tank bypass
This is the water inlet into a can; the pipe down to the bottom is not yet installed. The 45° elbow at the outlet allows to adjust the water level in the filter. It is normally located on the last tank.
Tanks 2 and 3 can be bypassed to intervene on them. One side of the bypass pipe is split so that it can be slightly tightened and installed. The sealing is not perfect, but this assembly allows, in this realization, to dry a tank without stopping the pump.
The passage of cables
In this configuration, the electrical panel is located on one side of the filter and the sockets on the other. The cables thus pass through the body in a 40 mm pipe.
Another view of the assembly, on the side of the electrical box.
The two arrivals of water
Two water arrivals are planned. The pipes pass through the body sizes before entering the tank.
A T-connector is placed at the inlet to the tank. A small elbow can be added at the top to avoid projections at pump start; the author indicates that this is not necessary in his case. The T remains removable to allow the installation of the 90 mm hose.
Lower power supply and diffusers
To drive the water to the bottom of the tank, a 90 mm pipe surrounds the inlet T. An anti-overflow cut is also made.
Four cuts at the bottom of each feed pipe distribute water in four directions.
The first tank
An overview of the first vessel, intended for brushes, with its two inlet water. The elbow at 45° is not necessary at this point.
Another view, with the top plate of the filter already installed.
Other vats and air passages
View of one of the tanks 2, 3 or 4.
On the water supply side, the two fittings are visible to the right; the water outlet is not yet cut and the cables are waiting for their outlets. The small pipe at the top right has two 45° elbows that join the top of the filter to let the pipes of the air pumps pass.
The sealant and surface preparation are those described in this construction. Check their compatibility with the materials used and follow the manufacturer's instructions.
A production of Patpre2000 for Aquatechnobel.