Patrick's Water Garden — Building and Gardening
Part II · Earthmoving and early works
Dig at the foot of the terrace
I chose to dig just at the foot of the terrace, knowing that the land was made up of embankment. Only the last 50 centimetres had to be really hard to dig, the ground being made up of limestone pads.
Build the gardener
The gardener is the first work that I have made: it allowed to accommodate a portion of the excess land from the pond.
Its construction includes a reinforced concrete outsole, 60 cm of concrete blocks and an upper chaining belting the whole. The interior is covered with a cement coating. The outer dressing is made with logs and wooden boards treated in autoclave.