The pond and its depth

The depth was limited to 1.25 m due to the resistance of the ground. To gain a few extra centimetres, it would have been necessary to rent a hammer-picker; so I contented myself with this depth.

Almost all the banks were made of concrete cast in circular formwork. The roughness of angular limestone stones was reduced and then covered with a low-dose cement coating.

The banks of the pond

The banks are mainly arranged with stones. In some places, I chose to nail the tarpaulin on logs; elsewhere, it passes behind them. These logs may rot over time, since they have their feet in the water.

Casting of the banks of the pond
Casting of the banks of the pond · Click to enlarge.
The concrete banks after casting
Concrete edges after casting · Click to enlarge.

Designing the Weir

The weir posed the most technical problems: I wanted the water to pass over the stones without letting see the tarpaulin, while preserving the possibility of draining the future canal.

A — Covering the spillway

The spillway is cast in reinforced concrete.

A — Couler the spillway · View 1
A — Cover the spillway · View 1 · Click to enlarge.

B — Paste the stones

Bradstone type stones are glued with a 1/1 mesh glass fabric incorporated.

B — Paste the stones · View 1
B — Paste stones · View 1 · Click to enlarge.
B — Paste the stones · View 2
B — Paste stones · View 2 · Click to enlarge.
B — Paste the stones · View 3
B — Paste stones · View 3 · Click to enlarge.

C — Putting the tarpaulin and the wall pass

The tarpaulin is laid and the wall pass is set up.

C — Place the tarpaulin and the wall pass · View 1
C — Place the tarpaulin and the wall pass · View 1 · Click to enlarge.

D — Fix the stones on the membrane

The stones are glued with TEC7 on the tarpaulin and fiberglass.

E — Making joints

The joints are cast between the stones.

E — Making joints · View 1
E — Make joints · View 1 · Click to enlarge.

F — Carrying out a first water launch

A first watering is carried out at the height of -15 cm indicated in the report.

F — Performing a first water launch · View 1
F — Performing a first water launch · View 1 · Click to enlarge.

The final level

The pond at final water level
The pond at the final water level · Click to enlarge.

The eight stages of Patrick's water garden