JFR Koi pond — Construction

Part II · Earthworks in December 2004 and masonry from March 2005

From digging the pit to finishing coatings, the photos follow the construction of the pond and the laying of the pipes.

Earthmoving and the choice of structure

The mineral and square aspect of the buildings leads to the choice of a formal pond, adapted to the setting of the courtyard. In December 2004, the 50 m³ pit was dug with the help of a mechanical shovel of 7 tons. With the abundance, nearly 80 m³ of land were displaced. The building in parpaings was entrusted to a masonry company. The masons retained 32 kg of blocks, poles and two levels of chaining. The masonry work began in March 2005.

Earthmoving and the choice of structure — photograph of the site 1
Earthmoving and the choice of structure · Photo 1 · Click to enlarge.
Earthmoving and the choice of structure — photograph of the site 2
Earthmoving and the choice of structure · Photo 2 · Click to enlarge.
Earthmoving and the choice of structure — photograph of the site 3
Earthmoving and the choice of structure · Photo 3 · Click to enlarge.
Earthmoving and the choice of structure — photograph of the site 4
Earthmoving and the choice of structure · Photo 4 · Click to enlarge.
Earthmoving and the choice of structure — photograph of the site 5
Earthmoving and the choice of structure · Photo 5 · Click to enlarge.
Earthmoving and the choice of structure — photograph of the site 6
Earthmoving and the choice of structure · Photo 6 · Click to enlarge.
Earthmoving and the choice of structure — photograph of the site 7
Earthmoving and the choice of structure · Photo 7 · Click to enlarge.
Earthmoving and the choice of structure — photograph of the site 8
The earthmoving and the choice of structure · Photo 8 · Click to enlarge.

Setting up the bottom drains of substance

The bottom covers and their pipes are put in place.

The setting up of the bottom bottom drains — photograph of the site 9
The implementation of the background bottom drains · Photo 9 · Click to enlarge.
The setting up of the bottom bottom drains — photograph of the site 10
The implementation of the background bottom drains · Photo 10 · Click to enlarge.
The setting up of the bottom bottom drains — photograph of the site 11
The implementation of the background bottom drains · Photo 11 · Click to enlarge.
The setting up of the bottom bottom drains — photograph of the site 12
The implementation of the background bottom drains · Photo 12 · Click to enlarge.
The setting up of the bottom bottom drains — photograph of the site 13
The implementation of the background bottom drains · Photo 13 · Click to enlarge.
The setting up of the bottom bottom drains — photograph of the site 14
The implementation of the background bottom drains · Photo 14 · Click to enlarge.
The setting up of the bottom bottom drains — photograph of the site 15
The implementation of the background bottom drains · Photo 15 · Click to enlarge.
The setting up of the bottom bottom drains — photograph of the site 16
The implementation of the background bottom drains · Photo 16 · Click to enlarge.

Foundations

The photos show the realization of the foundations of the pond.

Foundations — photograph of the site 17
Foundations · Photo 17 · Click to enlarge.
Foundations — photograph of the site 18
Foundations · Photo 18 · Click to enlarge.
Foundations — photograph of the site 19
Foundations · Photo 19 · Click to enlarge.
Foundations — photograph of the site 20
Foundations · Photo 20 · Click to enlarge.
Foundations — photograph of the site 21
Foundations · Photo 21 · Click to enlarge.
Foundations — photograph of the site 22
Foundations · Photo 22 · Click to enlarge.

The first level of walls

The first level is high with two posts on each length and one post on each width. It ends with a chaining made with U-blocks.

The first level of the walls — photograph of the construction site 23
The first level of the walls · Photo 23 · Click to enlarge.
The first level of the walls — photograph of the site 24
The first level of the walls · Photo 24 · Click to enlarge.
The first level of the walls — photograph of the construction site 25
The first level of the walls · Photo 25 · Click to enlarge.
The first level of the walls — photograph of the site 26
The first level of the walls · Photo 26 · Click to enlarge.
The first level of the walls — photograph of the site 27
The first level of the walls · Photo 27 · Click to enlarge.
The first level of the walls — photograph of the construction site 28
The first level of the walls · Photo 28 · Click to enlarge.
The first level of the walls — photograph of the construction site 29
The first level of the walls · Photo 29 · Click to enlarge.

Second level and wall sockets

The second level rises on the same bases as the first, with the installation of intermediate water intakes in the walls.

The second level and the wall sockets — photograph of the site 30
Second level and wall sockets · Photo 30 · Click to enlarge.
The second level and the wall sockets — photograph of the site 31
Second level and wall sockets · Photo 31 · Click to enlarge.
The second level and the wall sockets — photograph of the site 32
Second level and wall sockets · Photo 32 · Click to enlarge.
The second level and the wall sockets — photograph of the site 33
Second level and wall sockets · Photo 33 · Click to enlarge.
The second level and the wall sockets — photograph of the site 34
Second level and wall sockets · Photo 34 · Click to enlarge.

Tracking water returns

Water return locations are identified and wall crossings are installed.

Water returns — picture of the site 35
Water returns · Photo 35 · Click to enlarge.
Water returns — photo of the site 36
Water returns · Photo 36 · Click to enlarge.
Water returns — photo of the site 37
Water returns · Photo 37 · Click to enlarge.
Water returns — photo of the site 38
Water returns · Photo 38 · Click to enlarge.
Water returns — photo of the site 39
Water returns · Photo 39 · Click to enlarge.
Water returns — photo of the site 40
Water returns · Photo 40 · Click to enlarge.
Water returns — photo of the site 41
Water returns · Photo 41 · Click to enlarge.

Upper chaining

The second level ends with a link. The photos show its realization and the water returns positioned.

The upper link — photograph of the site 42
The upper link · Photo 42 · Click to enlarge.
The upper link — photograph of the site 43
The upper link · Photo 43 · Click to enlarge.
The upper link — photograph of the site 44
The upper link · Photo 44 · Click to enlarge.
The upper link — photograph of the site 45
The upper link · Photo 45 · Click to enlarge.
The upper link — photograph of the site 46
The upper link · Photo 46 · Click to enlarge.

Skimmer and coatings

The skimmer is installed. A finish coating loaded with fiberglass and added with a water-repellent product is applied to the walls. The floor is prepared to receive the chape.

Skimmer and coatings — photograph of the site 47
Skimmer and coatings · Photo 47 · Click to enlarge.
Skimmer and coatings — photograph of the site 48
Skimmer and coatings · Photo 48 · Click to enlarge.
Skimmer and coatings — photograph of the site 49
Skimmer and coatings · Photo 49 · Click to enlarge.
Skimmers and coatings — photograph of the site 50
Skimmer and coatings · Photo 50 · Click to enlarge.
Skimmer and coatings — photograph of the site 51
Skimmer and coatings · Photo 51 · Click to enlarge.
Skimmer and coatings — photograph of the site 52
Skimmer and coatings · Photo 52 · Click to enlarge.
Skimmer and coatings — photograph of the site 53
Skimmer and coatings · Photo 53 · Click to enlarge.
Skimmer and coatings — photograph of the site 54
Skimmer and coatings · Photo 54 · Click to enlarge.

The casting of the bottom

The bottom is cast with a concrete whose dosage announced in the report is 350 kg. Finish coating is also fibrated and hydrofused.

The casting of the bottom — photograph of the site 55
The casting of the bottom · Photo 55 · Click to enlarge.
The casting of the bottom — photograph of the site 56
The casting of the bottom · Photo 56 · Click to enlarge.
The casting of the bottom — photograph of the site 57
The casting of the bottom · Photo 57 · Click to enlarge.
The casting of the bottom — photograph of the site 58
The casting of the bottom · Photo 58 · Click to enlarge.

The pipelines of the intermediate outlets

The 90 mm PVC pipes are installed to connect the intermediate water outlets.

The pipelines of the intermediate outlets — photograph of the site 59
The pipes of the intermediate outlets · Photo 59 · Click to enlarge.
The pipelines of the intermediate outlets — photograph of the site 60
The pipes of the intermediate outlets · Photo 60 · Click to enlarge.
The pipelines of the intermediate outlets — photograph of the site 61
The pipes of the intermediate outlets · Photo 61 · Click to enlarge.
The pipelines of the intermediate outlets — photograph of the site 62
The pipes of the intermediate outlets · Photo 62 · Click to enlarge.
The pipelines of the intermediate outlets — photograph of the site 63
The pipes of the intermediate outlets · Photo 63 · Click to enlarge.
The pipelines of the intermediate outlets — photograph of the site 64
The pipes of the intermediate outlets · Photo 64 · Click to enlarge.

JFR's report