The Koï pond of JFR — The technical house
Part Four · The filtration room
If the pond is the main tank of the project, the technical room is just as important. It houses the filtration elements. The gravitational operation of the pond determines in particular the level of the floors hosting the prefilters.
Prepare the ground
The construction begins with a cleaning of the site.
Delimiting foundations and levels
Foundations are defined taking into account the height of the ground. The gravitational operation requires the correct levels for prefilters.
Cover Foundations
Formwork is installed prior to concrete casting.
Couler the concrete
The foundations of the technical room take shape.
Build the technical house
The shelter is built to accommodate and protect filtration equipment.
Isolating the room
The construction continues with the isolation of the technical room.
Install the electrical panel
The report presents a picture of fifteen shots taken with ground, two of which are intended for heating. A helping hand is always appreciated and appreciated!