The world of koi and garden ponds

Michael's Lagunage — The Cascade

Sixth part · The two water blades

Here is the part dedicated to the installation of the two water blades, in points 7 and 8 of the overall plan.

Layout layout: both water blades are marked with numbers 7 and 8
Items 7 and 8 on the plan · Click to enlarge.

Mounting stones

The stone assembly for both levels of the waterfall. Michael takes advantage of the roof of the technical room as support for the highest larval.

Laying stones in the waterfall
Lay stones of the waterfall · Click to enlarge.
The cascade almost finished
The cascade almost finished · Click to enlarge.

Michael in action

Michael in action.

Michael at work
Michael at work · Click to enlarge.

The laying of the pavements

The laying of the cobblestones requires a little attention but does not present any particular difficulty.

Michael lays the stones
Michael lays the stones · Click to enlarge.

Preparation of the stabilizer

Here's the set ready to accommodate the stabilized.

Preparation of laguing for stabilization
Preparation of the lagoon for stabilization · Click to enlarge.

The 14 stages of the report